LATEST ACTUAL STAGE:
S2A: Pre-Feasibility (2017)PROJECT LOCATION
Central African Republic Democratic Republic of CongoPROJECT INSTITUTION:
Lake Chad Basin CommissionBENEFICARY COUNTRIES
Central African Republic Democratic Republic of CongoPROJECT DIMENSIONS:
STARTING_DATE:
COMPLETION_DATE:
PREPARATION COST:
3.00 million USDCAPEX COST:
0.00 million USDPROJECT STAGE:
S2A: Pre-Feasibility
PROJECT FEATURED IN:
Construction of an Oubangui flow control dam to allow river navigation between Bangui and Congo and the Democratic Republic of Congo (DRC); in the Congo River Basin, and electricity production to supply Bangui and surrounding areas in the DRC and Congo. Improve the navigability of Obangui River with an added hydropower component.
The project aims to provide solutions to the problems of interruption of navigation on Oubangui River, tributary of the Congo River in the region of Central Africa. This is particularly the case during periods of low water levels, and the supply of electricity to the Central African Republic (CAR), North Congo and the Congo. DRC, through the construction of a Oubangui flow control and power generation dam at the Palambo site, is about 60 km upstream from Bangui.
The characteristics of the scenario chosen among the solutions proposed by SOGREAH in 1990 were as follows:
| PREPARATION | CAPEX | |
|---|---|---|
| COST: | 3.00 | 0.00 |
| COST SECURED: | 0.00 | 0.00 |
| FINANCING TYPE: | Other | |
| FINANCIERS: |
Central African Economic and Monetary Community
Economic Community of Central African States
Global Water Partnership
Lake Chad Basin Commission
Zambia - Ministry of Water Development, Sanitation and Environmental Protection
KOMODE Etienne Noel-ekomode@yahoo.fr
MOUSSA Ousman-oumous2003@hotmail.com
Mr Georges Gulemvuga-georges_gul@yahoo.fr
Mr Désiré Armand Ndemazagoa-Backotta-dndemazagoa@yahoo.fr
Mme Marie Thérèse Chantal Mfoula-contact@ceeac-eccas.org