Transport

Inland Port & Waterway

GENDER SENSITIVITY

 

URBAN-RURAL CONNECTIVITY

 

CLIMATE SENSITIVITY

 

PIDA PROGRAMME:
20 - Northern Multimodal Transport Corridor

LATEST ACTUAL STAGE:

S2B: Feasibility (2018)

PROJECT LOCATION

Tanzania

PROJECT INSTITUTION:

Tanzania Ports Authority

BENEFICARY COUNTRIES

Tanzania

PROJECT DIMENSIONS:

Goods Throughput: 2 mtpa

STARTING_DATE:

COMPLETION_DATE:

PREPARATION COST:

1.00 million USD

CAPEX COST:

10.00 million USD

PROJECT STAGE:

S2B: Feasibility

PROJECT FEATURED IN:

Mwanza Port Dredging and Upgrading

Upgrading of Mwanza South Lake Port, including modernization, navigation aid, dredging and sedimentation protection (Tanzania)

DESCRIPTION

The project comprise of the following: (1) complete or initiate dredging of port of Mwanza to restore design depths of generally around 6 m on approach to, in anchorage and along Berths; (2) establish a watercourse management system to minimize soil erosion and sedimentation at ports; and (3) rehabilitating or establishing of areas and ramps to accommodate vehicles (in particular MAFI trailers and forklifts) involved with RoRo operations at ports.

OBJECTIVES AND RATIONALE

PROJECT RISKS

Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported

PROJECT ECONOMICS

  • NET PRESENT VALUE: 0.00
  • COST BENEFIT RATIO: 0.00
  • FINANCIAL INTERNAL RATE OF RETURN (FIRR): 0.00
  • ECONOMIC INTERNAL RATE OF RETURN (EIRR): 0.00
  • COMMENTS ON ECONOMICS:

PROJECT FINANCING

PREPARATION CAPEX
COST: 1.00 10.00
COST SECURED: 0.00 0.00
FINANCING TYPE:
FINANCIERS:
OPERATION AND MAINTENANCE
OVERALL COST: 0.00
ANNUAL COST: 0.00
COMMENTS ON FINANCE:

STUDIES

PROJECT STAKEHOLDERS

Regional Coordinator

East African Community

Lead National Agency

Tanzania Ports Authority

Sectoral Organisation

Port Management Association of Eastern and Southern Africa

Sectoral Organisation

Northern Corridor Transit Transport Coordination Authority

CONTACTS

Infrastructure Expert (NEPAD) Mr. David Niyonsenga -DavidN@nepad.org

CONTRIBUTION TO 2030 AGENDA

Associated existing or planned project(s)

Bujumbura Lake Port Upgrading
Kigoma Port Upgrading
Port Bell Upgrading