Energy

Power Interconnector

GENDER SENSITIVITY

 

URBAN-RURAL CONNECTIVITY

 

CLIMATE SENSITIVITY

 

PIDA PROGRAMME:
8 - West Africa Power Transmission Corridor

LATEST ACTUAL STAGE:

S4B: Construction (2017)

PROJECT LOCATION

Benin Ghana Togo

PROJECT INSTITUTION:

Communauté Electrique du Bénin Ghana Grid Company

BENEFICARY COUNTRIES

Benin

Ghana

Togo

PROJECT DIMENSIONS:

Voltage: 330 kV

STARTING_DATE:

COMPLETION_DATE:

PREPARATION COST:

0.00 million USD

CAPEX COST:

120.00 million USD

PROJECT STAGE:

S4B: Construction

PROJECT FEATURED IN:

330 kV Ghana – Togo – Benin Transmission Interconnection Project

The 330 kV Ghana – Togo - Benin Interconnection Project is part of the WAPP Coastal Transmission Backbone which aims at establishing a robust interconnection link and corridor for power exchanges among Ghana, Côte d’Ivoire, Benin/Togo and Nigeria. The project involves the construction of approximately 350 km of 330 kV transmission line from Tema Swithching Station in Ghana (Volta) over a distance of 140 km to the Ghana /Togo Border (Lome “C”) and 98 km of 330 kV line from Lome “C” to the Togo/Benin Border and from there an 110 km 330 kV line to the Sakete Substation in Benin. It also comprises the extension of the 330 kV switching substation in Tema, Ghana, construction of 330/161/20 kV substation in Lome “C”, Togo and the extension of the 330 kV substation at Sakete in Benin.

DESCRIPTION

This project forms part of the  priority projects  identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The project involves the construction of approximately 350 km of 330 kV transmission line from Tema Swithching Station in Ghana (Volta) over a distance of 140 km to the Ghana /Togo Border (Lome “C”) and 98 km of 330 kV line from Lome “C” to the Togo/Benin Border and from there an 110 km 330 kV line to the Sakete Substation in Benin.  It also comprises the extension of the 330 kV switching substation in Tema, Ghana, construction of 330/161/20 kV substation in Lome “C”, Togo and the extension of the 330 kV substation at Sakete in Benin.

OBJECTIVES AND RATIONALE

PROJECT RISKS

PROJECT ECONOMICS

  • NET PRESENT VALUE: 0.00
  • COST BENEFIT RATIO: 0.00
  • FINANCIAL INTERNAL RATE OF RETURN (FIRR): 0.00
  • ECONOMIC INTERNAL RATE OF RETURN (EIRR): 0.00
  • COMMENTS ON ECONOMICS:

PROJECT FINANCING

PREPARATION CAPEX
COST: 0.00 120.00
COST SECURED: 0.00 120.00
FINANCING TYPE:
FINANCIERS:
OPERATION AND MAINTENANCE
OVERALL COST: 0.00
ANNUAL COST: 0.00
COMMENTS ON FINANCE:

STUDIES

PROJECT STAKEHOLDERS

Lead National Agency

Communauté Electrique du Bénin

Regional Coordinator

Economic Community of West African States

Lead National Agency

Ghana Grid Company

Sectoral Organisation

West Africa Power Pool

CONTACTS

Bernard Hessou-bhessou@ecowapp.org

Mr. Peter Ofori-Asumadu -poasumadu@yahoo.com

CONTRIBUTION TO 2030 AGENDA

Associated existing or planned project(s)

330 kV Côte d'Ivoire - Ghana Interconnection Reinforcement