Water

Water Transfer

GENDER SENSITIVITY

 

URBAN-RURAL CONNECTIVITY

 

CLIMATE SENSITIVITY

 

LATEST ACTUAL STAGE:

S2B: Feasibility (2020)

PROJECT LOCATION

Namibia South Africa

PROJECT INSTITUTION:

BENEFICARY COUNTRIES

Namibia

South Africa

PROJECT DIMENSIONS:

STARTING_DATE:

COMPLETION_DATE:

PREPARATION COST:

55.11 million USD

CAPEX COST:

501.00 million USD

PROJECT STAGE:

S2B: Feasibility

PROJECT FEATURED IN:

Noordoewer-Vioolsdrift Dam

Orange River System (ORS) is one of the most highly developed River Systems in Southern Africa. In September 2015, Namibia and South Africa, under the auspices of the PWC, commissioned the Noordoewer / Vioolsdrift Dam (NVD) Feasibility Study, which aimed at identifying and optimising the best development dam size(s), site(s) and sequence of dam developments in the ORS needed to achieve the overall catchment objectives, to re-regulate the flows for ecological needs and to increase the yield in the Orange River System for use by both RSA and Namibia. The study was completed in May 2020.

DESCRIPTION

Orange River System (ORS) is one of the most highly developed River Systems in Southern Africa. In September 2015, Namibia and South Africa, under the auspices of the PWC, commissioned the Noordoewer / Vioolsdrift Dam (NVD) Feasibility Study, which aimed at identifying and optimising the best development dam size(s), site(s) and sequence of dam developments in the ORS needed to achieve the overall catchment objectives, to re-regulate the flows for ecological needs and to increase the yield in the Orange River System for use by both RSA and Namibia. The study was completed in May 2020.

The study investigated many possible options and in 2016 initially concluded that the optimal NVD would have a wall height of about 73 m, with a storage capacity of 2,800 million m3 and would be of concrete faced rock fill type (CFRD).

Certain limited further feasibility studies are required before the project can proceed to implementation. Such studies would include at least an independent review of the above findings, the finalisation of the exact parameters for the recommended optimal NVD in terms of size, site and type, and obtaining environmental authorisation for implementation.

The development of the NVD project will involve the following further stages:

  • Further feasibility studies
  • Detailed designs, procurement and construction

The initially proposed NVD was sized as a concrete face rockfill dam (CFRD), with parameters as set out below, consisting of a side spillway, outlet works, hydroelectric plant, river flow gauging weir, etc. Parameter Description: Full Supply Level (FSL)-230 masl; Freeboard-12.5 m; Non-Overspill Crest (NOC)-242.5 masl; Lowest River Bed Level-162 masl; Dam Height up to NOC Level-80.5 m; Crest Length-1 km; Crest Width-10 m; and Embankment Slopes- 1V:1.4H. However, the exact dam parameters will be confirmed on completion of the further studies referred to above.

The project serves a planned infrastructure asset of another sector, but there is less than 50% overlap in the geography serviced by the proposed project and the other sector planned asset.

This planned project is part of the entire Orange River System (ORS) and is supported from the existing regulation infrastructure/dams upstream in Lesotho and South Africa.

OBJECTIVES AND RATIONALE

PROJECT RISKS

PROJECT ECONOMICS

  • NET PRESENT VALUE: 0.00
  • COST BENEFIT RATIO: 0.00
  • FINANCIAL INTERNAL RATE OF RETURN (FIRR): 0.00
  • ECONOMIC INTERNAL RATE OF RETURN (EIRR): 0.00
  • COMMENTS ON ECONOMICS:

PROJECT FINANCING

PREPARATION CAPEX
COST: 55.11 501.00
COST SECURED: 0.00 0.00
FINANCING TYPE:
FINANCIERS:
OPERATION AND MAINTENANCE
OVERALL COST: 25.05
ANNUAL COST: 0.00
COMMENTS ON FINANCE:

STUDIES

PROJECT STAKEHOLDERS

Lead REC

Southern African Development Community

CONTACTS

Ms. Maria Amakali-Maria.Amakali@mawf.gov.na

Mr. Livhuwani Mabuda-mabudal@dws.gov.za

CONTRIBUTION TO 2030 AGENDA