LATEST ACTUAL STAGE:
S3A: Project Structuring (2024)PROJECT LOCATION
EthiopiaPROJECT INSTITUTION:
Ethiopian Electricity Power Cooperation Ethiopian Minister of Water, Irrigation and ElectricityBENEFICARY COUNTRIES
Ethiopia SudanPROJECT DIMENSIONS:
Voltage: 2909 kVSTARTING_DATE:
COMPLETION_DATE:
PREPARATION COST:
186.00 million USDCAPEX COST:
1860.00 million USDPROJECT STAGE:
S3A: Project Structuring
PROJECT FEATURED IN:
Construction of the Ethiopia section of the 2,909 km / 500 kV Ethiopia to Sudan transmission interconnector. The project comprises a power transmission interconnector between Ethiopia and Sudan, including 580km of new 500kV transmission lines, of which approximately 16km will be in Ethiopia, starting at the Grand Ethiopia Renaissance Dam (GERD).
Construction of a transmission line (2909 km / 500 kV) that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The interconnector will have a transmission capacity of 4000 MW.
The Project also includes two new, 500 kV capacitated substations at Rabak and Jebel Aulia (both in Sudan), and power line bay extensions at the following existing substations: Grand Renaissance (500kV Ethiopia), Rabak (220kV, Sudan) and Jebel Aulia (220kV, Sudan).
| PREPARATION | CAPEX | |
|---|---|---|
| COST: | 186.00 | 1860.00 |
| COST SECURED: | 0.00 | 0.00 |
| FINANCING TYPE: | ||
| FINANCIERS: |
Common Market for Eastern and Southern Africa
Eastern Africa Power Pool
Ethiopia - Government of Ethiopia
Ethiopian Electricity Power Cooperation
Ethiopian Minister of Water, Irrigation and Electricity
Nile Basin Initiative
Sudan - Government of Sudan
Inter Governmental Authority on Development
Mr. Snowden Mmadi -SnowdenM@nepad.org