Energy

Power Interconnector

GENDER SENSITIVITY

 

URBAN-RURAL CONNECTIVITY

 

CLIMATE SENSITIVITY

 

PIDA PROGRAMME:
6 - Central African Power Interconnection

LATEST ACTUAL STAGE:

S2B: Feasibility (2017)

PROJECT LOCATION

Democratic Republic of Congo

PROJECT INSTITUTION:

DRC - Société nationale d'électricité

BENEFICARY COUNTRIES

Angola

Democratic Republic of Congo

PROJECT DIMENSIONS:

Voltage: 260 kV

Power: 600 MW

STARTING_DATE:

COMPLETION_DATE:

PREPARATION COST:

1.60 million USD

CAPEX COST:

191.00 million USD

PROJECT STAGE:

S2B: Feasibility

PROJECT FEATURED IN:

DRC - Angola Transmission Interconnector (DRC section)

The project aims to provide a direct transmission link between Angola and DRC, through the construction of the DRC section of the 260 km / 400 kV DRC line to Angola of the Inga-Cabinda-Pointe-Noire transmission interconnector.

DESCRIPTION

The project is part of the Inga-Cabinda-Pointe Noire transmission interconnector, linking the power systems of DRC, Angola and Congo, with a transfer capacity of 600 MW. The project involves the construction of a section in DRC from Inga to the border with Angola.

OBJECTIVES AND RATIONALE

PROJECT RISKS

PROJECT ECONOMICS

  • NET PRESENT VALUE: 0.00
  • COST BENEFIT RATIO: 0.00
  • FINANCIAL INTERNAL RATE OF RETURN (FIRR): 0.00
  • ECONOMIC INTERNAL RATE OF RETURN (EIRR): 0.00
  • COMMENTS ON ECONOMICS: Project economics and finances reflected here also refers also to “E.06.01.02 DRC - Angola Transmission Interconnector (Angola section)”.

PROJECT FINANCING

PREPARATION CAPEX
COST: 1.60 191.00
COST SECURED: 0.00 0.00
FINANCING TYPE:
FINANCIERS:
OPERATION AND MAINTENANCE
OVERALL COST: 0.00
ANNUAL COST: 0.00
COMMENTS ON FINANCE:
Project in NEPAD-IPPF grant pipeline for the year 2020.

STUDIES

PROJECT STAKEHOLDERS

Regional Coordinator

Southern African Development Community

Lead National Agency

DRC - Société nationale d'électricité

Sectoral Organisation

Central Africa Power Pool

National Coordination

DRC - Ministry of Energy and Water Resources

CONTACTS

Infrastructure Expert (NEPAD) Mr. Ahid Maeresera -ahidm@nepad.org

CONTRIBUTION TO 2030 AGENDA

Associated existing or planned project(s)

DRC - Angola Transmission Interconnector (Angola section)