Energy

Hydro Power Plant

GENDER SENSITIVITY

 

URBAN-RURAL CONNECTIVITY

 

CLIMATE SENSITIVITY

 

PIDA PROGRAMME:
7 - Sambangalou Hydropower

LATEST ACTUAL STAGE:

S4A: Tendering (2018)

PROJECT LOCATION

Guinea Senegal

PROJECT INSTITUTION:

Organisation pour la Mise en Valeur du Fleuve Gambie

BENEFICARY COUNTRIES

Guinea

Senegal

PROJECT DIMENSIONS:

Annual Hydroelectric Production: 402 GWh

Total Installed Capacity: 128 MW

STARTING_DATE:

COMPLETION_DATE:

PREPARATION COST:

23.00 million USD

CAPEX COST:

455.00 million USD

PROJECT STAGE:

S4A: Tendering

PROJECT FEATURED IN:

Sambangalou Hydropower Plant

Construction of the Sambangalou Dam, with an installed capacity of 128 MW and a 3.8 km3 reservoir, which is a transboundary initiative of the Gambia River Basin Organisation (OMVG). The project involved four countries, namely The Gambia, Guinea, Guinea-Bissau and Senegal.

DESCRIPTION

The proposed Sambangalou dam project entails the construction of a gravity dam, with a 128 MW capacity, and a 3.8 km3 reservoir. The dam is located in Senegal, 930 km upstream from the mouth of the Gambia river and about 25 km south of Kédougou. The reservoir overlaps Senegal and Guinea. The project now has two components, i.e. Sambangalou Dam and an interconnection transmission line which will link the Sambangalou and Kaleta dams to the electric grid of the four member countries.

The project was formerly part of larger OMVG Energy project involving fuoir countries (with Kaleta dam in Guinea and interconnecting power grid), however it split in 2011 after Guinea decided to develop Kaleta dam as a standalone.

 

OBJECTIVES AND RATIONALE

PROJECT RISKS

Environmental Risks: deteriorated water quality and fish yields downstream

PROJECT ECONOMICS

  • NET PRESENT VALUE: 210.00
  • COST BENEFIT RATIO: 0.60
  • FINANCIAL INTERNAL RATE OF RETURN (FIRR): 0.00
  • ECONOMIC INTERNAL RATE OF RETURN (EIRR): 0.00
  • COMMENTS ON ECONOMICS: • Planned AFDB debt 14% of total CAPEX. • IRR: 13.8% • Resettlement necessary, i.e budget of USD 23m for 1.250 ha flooded affecting 1,320 persons

PROJECT FINANCING

PREPARATION CAPEX
COST: 23.00 455.00
COST SECURED: 0.00 0.00
FINANCING TYPE:
FINANCIERS:
World Bank
African Development Bank
African Development Bank
OPERATION AND MAINTENANCE
OVERALL COST: 0.00
ANNUAL COST: 0.00
COMMENTS ON FINANCE:
Re-dedication of funding discussed with a further USD 250m required to be raised.

STUDIES

PROJECT STAKEHOLDERS

Regional Coordinator

Economic Community of West African States

Lead National Agency

Organisation pour la Mise en Valeur du Fleuve Gambie

CAPEX Funder

African Development Bank

Regional Coordinator

West Africa Power Pool

Continental Coordinator

African Union Development Agency

Preparation Funder

World Bank

CONTACTS

Infrastructure Expert (COMESA) Mr. Peter Ofori-Asumadu -poasumadu@yahoo.com

CONTRIBUTION TO 2030 AGENDA

Associated existing or planned project(s)

Kaléta Hydropower Plant