Energy

Power Interconnector

GENDER SENSITIVITY

 

URBAN-RURAL CONNECTIVITY

 

CLIMATE SENSITIVITY

 

PIDA PROGRAMME:
9 - North Africa Power Transmission Corridor

LATEST ACTUAL STAGE:

TBC: Data Not Available (2013)

PROJECT LOCATION

Algeria

PROJECT INSTITUTION:

Algeria - Societe Nationale de l`Ectricité et du Gaz

BENEFICARY COUNTRIES

Algeria

Tunisia

PROJECT DIMENSIONS:

Voltage: 220 kV

Power: 1000 MW

STARTING_DATE:

COMPLETION_DATE:

PREPARATION COST:

17.00 million USD

CAPEX COST:

161.00 million USD

PROJECT STAGE:

TBC: Data Not Available

PROJECT FEATURED IN:

Algeria - Tunisia section of ELTAM Transmission Interconnector (Algeria part)

Reinforcement of the Algeria part of the 220 km / 400 kV Algeria to Tunisia section the ELTAM transmission interconnector.

DESCRIPTION

This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Algeria part of the 220 km / 400 kV Algeria to Tunisia section from Cheffia in Algeria to the Tunisia border.

OBJECTIVES AND RATIONALE

PROJECT RISKS

Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported

PROJECT ECONOMICS

  • NET PRESENT VALUE: 0.00
  • COST BENEFIT RATIO: 0.00
  • FINANCIAL INTERNAL RATE OF RETURN (FIRR): 0.00
  • ECONOMIC INTERNAL RATE OF RETURN (EIRR): 0.00
  • COMMENTS ON ECONOMICS:

PROJECT FINANCING

PREPARATION CAPEX
COST: 17.00 161.00
COST SECURED: 0.00 0.00
FINANCING TYPE:
FINANCIERS:
OPERATION AND MAINTENANCE
OVERALL COST:
ANNUAL COST:
COMMENTS ON FINANCE:

STUDIES

PROJECT STAKEHOLDERS

Regional Coordinator

Arab Maghreb Union

Lead National Agency

Algeria - Societe Nationale de l`Ectricité et du Gaz

Sectoral Organisation

Comité Maghrébin de l'Electricité

CONTACTS

CONTRIBUTION TO 2030 AGENDA

Associated existing or planned project(s)

Algeria - Tunisia section of ELTAM Transmission Interconnector (Tunisia part)