LATEST ACTUAL STAGE:
S4B: Construction (2013)PROJECT LOCATION
Cameroon Equatorial GuineaPROJECT INSTITUTION:
Cameroon - Direction Générale des Grands Travaux: Direction des RoutesBENEFICARY COUNTRIES
Cameroon Equatorial GuineaPROJECT DIMENSIONS:
Length: 70 km Number of Lanes: 2 lanesSTARTING_DATE:
COMPLETION_DATE:
PREPARATION COST:
3.94 million USDCAPEX COST:
0.00 million USDPROJECT STAGE:
S4B: Construction
PROJECT FEATURED IN:
Detailed study of the inter-capital connections to identify missing links for the upgrading of the 70km Kribi-Campo Bata road and bridge over the Ntem river as well as access roads between Campo Beach (Cameroon) and Rio Campo (Equitorial Guinea).
The project entails detailed studies and engineering designs for the construction of a bridge over the Ntem River and its access roads linking the Republics of Cameroon and Equatorial Guinea.
The project also includes the construction of a one-stop border post (OSBP) and the implementation of trade facilitation measures along the Transport Corridor linking Yaoundé in Cameroon, Bata in Equatorial Guinea and Libreville in Gabon.
| PREPARATION | CAPEX | |
|---|---|---|
| COST: | 3.94 | 0.00 |
| COST SECURED: | 3.04 | 0.00 |
| FINANCING TYPE: | ||
| FINANCIERS: |
Economic Community of Central African States
Cameroon - Direction Générale des Grands Travaux: Direction des Routes
African Development Bank